• Driving Continuous Improvement

    Lonmin increases smelter throughput by 10% while improving recovery

In 2007, platinum prices were at an all-time high, so Lonmin wanted to maximize efficiency and unlock any hidden capacity in its process. GE previously helped the Lonmin concentrating section to solve some tough challenges, so GE was called in again to help in the smelter area.

The GE software solution helped remove bottlenecks, improve process stability, and increase efficiency. Results were so positive that the solution was expanded to include several other sections in the smelter, and it was further expanded to include monitoring of the control systems.

Following solution implementation, outcomes included:

  • 10%+ increase in throughput in the filter and drying section
  • 25% decrease in variation in feed into the slag mill 
  • 45% decrease in variation in cyclone feed pressure

Related Stories

Find out how the Industrial Internet is changing the game for industrial companies. Our customers are leveraging industrial big data and predictive analytics every day to optimize their processes and asset performance. They’re on a journey. Their outcomes are real. And they’re powered by the Industrial Internet.

Story

Power plant avoids catastrophe by proactively replacing faulty transition piece

Learn how GE’s Asset Performance Management detected an increase in blade path temperature spread for a power plant.

View
Story

Global Oil & Gas Company saves millions of dollars by replacing turbine 12 months ahead of schedule

Learn how GE helped save an Oil & Gas company millions of dollars by detecting a defected turbine early on.

View
Story

Global Oil & Gas Company avoids catastrophe by proactively repairing damaged blades

Learn how GE's SmartSignal detected increased vibrations for an Oil & Gas company.

View

0 Results