Step 1.3. View the Tracker Configuration Tree: RCO Section
The RCO directory is organized in a hierarchy so that information for a control site can be easily accessed, viewed, and modified.
Each level of data in the RCO hierarchy has a function as follows:
1 | RCO Site | Contains all of the instructions for making production routing decisions in the RCO configuration. |
2 | Control sites folder | Contains all of the instructions for making production routing decisions for a group of control sites. |
3 | Control site | Contains all of the instructions for making production routing decisions for a control sites. |
4 | Trigger folder | Folder that holds all of the configured triggers for the control site. |
5 | Trigger | One or more points that will activate the control site when its defined conditions are met. |
6 | Decisions folder | Folder that holds all of the configured decisions for the control site. |
7 | Decision | Selected for configuration. Instructions for executing an output module, which in turn, sets a series of points. Actual production routing is performed at this juncture. |
8 | Decision | Not selected |
9 | Routing_Logic folder | Folder that holds all of the configured routing logic modules for the control site. |
10 | Routing logic modules | Modules that consist of function blocks to achieve a particular routing result in line with factory conditions. |