OEE Parameters Calculation for Discrete Lines

The OEE calculation for Discrete Lines is similar classic OEE mode approach to the OEE calculation for standard units. It measures the performance and quality losses in terms of loss of production availability or productivity that are attributed to the performance and quality, respectively.

Unlike Classic OEE, OEE for discrete lines uses NCM subsystem as a source for Quality data instead of Waste records. It relies on disposition type to separate Good and Bad Quality. Also, for individual unit, operations are considered as an output. OEE for finished good is calculated on the virtual unit for each discrete line.

The OEE parameters Availability, Performance, and Quality for discrete lines are calculated based on the formula described in the following table.

OEE Parameter Calculation Formula
Availability

Availability = Net availability run time/Planned production time, where, Net availability run time = Planned production time - Availability downtime.

Performance

Performance = Actual production/Target production.

Where,

  • Actual production is the actual productivity of the Unit.

    Target production is the potential productivity of the Unit

Note: Rework operations are not included in the output count.
Quality

Quality = Net production/Actual production

Where,

  • Net production = Actual production - Waste
  • Actual production is the actual productivity of the Unit

Waste is the amount of operations where defects were generated (open defects are considered as bad quantity, normally scrap and rework are also considered as waste).

Discrete Line OEE Parameters Calculation

In this example, the value for each OEE parameter per day for a discrete manufacturing plant is as shown in the following table.

Inputs Value
Planned production time 24hr
Availability downtime unit 1 1hr
Availability downtime unit 2 2hr
Op 10 Actual production 900 units
Op 10 Target production 1000 units
Op 20 Actual production 800 units
Op 20 Target production 1000 units
Op 10 units with defects 100
Op 20 units with defects 100

The following table provides the value of each OEE parameter calculated based on the formula described in the earlier section.

OEE parameter Parameter value Formula used Explanation
Availability

Unit 1: 23/24 = 96%

Unit 2: 22/24=92%

Virtual Unit = 100%
Availability = Net availability run time/Planned production time.

For Unit 1:

Planned production time = 24 hr

Availability downtime = 1 hr

Net availability run time = 24 - 1 = 23 hr

For Unit 2

Planned production time = 24 hr

Availability downtime = 2 hr

Net availability run time = 24 - 2 = 22 hr
Performance

Unit 1 900/1000 = 0.9

Unit 2 800/1000 = 0.8

Virtual Unit

800/1000 = 0.8

Performance = Actual production/Target production

Unit 1: Actual production = 900 bottles

Target production = 1000 bottles

Unit 2: Actual production = 800 bottles

Target production = 1000 bottles

Virtual Unit: Actual production = 800 bottles (both operations complete)

Target production = 1000 bottles
Quality

Unit 1 800/900 = 0.8889

Unit 2 700/800=0.875
Quality = Net production/Actual production

Unit 1: Actual production = 900 bottles

Waste = 100 bottles

Net production = 900 - 100 = 800 bottles

Unit 2: Actual production = 800 bottles

Waste = 100 bottles

Net production = 800 - 100 = 700 bottles