About this task
Tip: Follow the same procedure you used to move a block from the SCHEDULE region into the LOAD region.
Clear the Insert check box in the Destination dialog box.
A checked Insert will insert a new empty location at the specified location and put the new item there.
A
Move a CARRIER to the LOAD Region
B
Confirm that the Carrier Moved
Procedure
Move a CARRIER to the LOAD Region.
Select the Carrier CCAR567 to move to the LOAD region.
Click the Move Item button on the PRT_UI toolbar.
A Destination dialog box opens.
Note: Clear the Insert check box in the Destination dialog box.
A checked Insert will insert a new empty location at the specified location and put the new item there.
Click OK.
Result: The LOAD_CONV region displays.
Confirm that the Carrier Moved.
The available carriers should have changed in the LOAD_CONV and LOAD regions.
The LOAD_CONV region now should have four blocks, not five.
Blocks that were in Locations 4 and 5 should now be in Locations 3 and 4.
Both the block and the carrier are now in the LOAD region.
CBLK234 is in the LOAD region's Location 1.
CCAR567 is in the LOAD region's Location 1.
The LOAD region was configured to allow 2 items per location .
Do you remember why you need to clear the Insert check box? Review what happens when you insert or add an item to a region. Check the PRT Region Configuration dialog box; how many locations are in the LOAD region; how many items per location.