10. Show Master Label History
About this task
A Change Management Master Label project version enables:
- Users to select any version of a project and/or computer (system) as its Master label.
- The Change Management Scheduler to compare the current local version against the Master version.
Note:
- Only one version at a time can be selected as the Master for the project and one version for the computer.
- Before this enhancement the Change Management Scheduler could only compare (and optionally backup) the current version of a local project/computer against the last checked in project/computer version.
- Local computer: New Master Label features.
- Change Management Server: Required Master Label configuration.
Local Computer: New Master Label Features
The following new and enhanced Change Management features enable you to select and work with the Master Label.
- Project/Computer New and Enhanced Manage Menu Items
- Show History: Enhanced PCM History Window
- Show Master Label History: New PCM (Master Label) History Window
Project/Computer New and Enhanced Manage Menu Items
Do the following to display either the Project or the Computer Manage menus.
Procedure
Results
The Scheduler will now run the script to compare the Master Label project with the current project version.
Note: If the Master Label is not set through the Project List for <event name> dialog box, the script will fall back to comparing the latest version on the Change Management server with the current version.
Permissions to select the Master Label
CIMPLICITY Change Management users can select project versions as the Master version only if the feature is set to True on the Change Management Server.
Do the following.
A | Select Access Control>Groups>CIMOPRGRP>Permissions>Change Management in the Machine Edition Navigator. |
B | Select True for Set Master Version in the Inspector. |