Skip to main content
×

GE.com has been updated to serve our three go-forward companies.

Please visit these standalone sites for more information

GE Aerospace | GE Vernova | GE HealthCare 

Press Release

Qantas Group signs $2.0 Billion Order for advanced Leap-1A Engines to power A320neo aircraft

April 19, 2012

First CFM-powered A320 aircraft in Qantas Group fleet

Extends 20-year relationship with CFM, a 50/50 joint venture between GE and Snecma

Sydney, Australia -- 19 April 2012: The Qantas Group today announced it has signed a US$2.0 billion order (including spare engines) for advanced LEAP-1A engines to power 78 Airbus A320neo aircraft currently on order.

The LEAP engine, developed by CFM International (a 50/50 joint venture between GE and Snecma (Safran group), is one of the world's most advanced aircraft engines, delivering:


business unit
tags
Press Release

GEエナジーはFDKにDLynx™ Point of Load ポートフォリオのライセンスを提供

April 18, 2012

アジア市場におけるOEM顧客に対し低リスクなデジタル電源のマルチソースの提供が可能となりました
(本内容は4月17日、米国で発信されたリリースの翻訳です)

2012年4月17日、GEエナジーは、FDK株式会社(本社:東京都港区)にDLynx™デジタル*ポイント*オブ*ロード(POL)DC-DCコンバータの製品ポートフォリオをライセンス供与することに合意しました。この技術ライセンス契約により、OEMメーカーの顧客に対し、エネルギー効率の最適化、冷却装置の必要性の低減、リスク低減や新製品開発の加速を支援します。GEエナジーのFDKへのDLynx製品ライセンス供与により、OEMメーカーは3アンペアから40アンペアの容量にいたるまで互換性と相互運用性をもつ複数の調達オプションを得て、サプライチェーン目標を達成することが可能となります。


business unit
tags
Press Release

GE Wind Turbines Selected by Chinese Wind Power Developer for 100-Megawatt Project in Canada

April 17, 2012
Press Release

GE Wind Turbines Selected by Chinese Wind Power Developer for 100-Megawatt Project in Canada

April 17, 2012
Press Release

GE Energy Licenses DLynx™ Point of Load Portfolio to FDK Corp

April 17, 2012

Agreement Provides OEM Customers in Asia Low-Risk, Multi-Sourcing Options for Digital Power


business unit
tags
Press Release

Offshore Turbine from GE Proves High Reliability, Availability Following First Trial Run

April 17, 2012
Press Release

GE Introduces New High-Speed Computed Tomography for Aerospace Production Lines

April 17, 2012

System Makes Quality Control More Precise and up to 200 Times Faster

LEWISTOWN, PA.---April 17, 2012---GE's (NYSE: GE) Inspection Technologies product line, a GE Measurement & Control business, today unveiled a new speed|scan atlineCT system. The system introduces high-speed, three-dimensional (3D) Computed Tomography (CT) for the inspection and stringent quality control of light metal castings and composite structures found across the aerospace sector.


business unit
tags
Press Release

GE's New Generation of Portable X-Ray Detectors Cuts the Cord and Goes Wireless

April 17, 2012

Enhanced Series Makes Giant Strides to Improve Mobility and Simplify Digital Readiness for Field Radiographic Inspection


business unit
tags
Press Release

Offshore Windenergieanlage von GE demonstriert nach erstem Testlauf hohe Zuverlässigkeit und Verfügbarkeit

April 17, 2012
  • Größte Windenergieanlage Schwedens im Hafen von Göteborg erreicht wichtigen Meilenstein
  • 99.05% Verfügbarkeit im Testlauf
  • 4.1-113 Windenergieanlage wird mehr als 3.000 schwedische Haushalte mit Strom versorgen

Kopenhagen, Dänemark -- 17. April 2012 -- GE (NYSE: GE) hat heute bekanntgegeben, dass die im Hafen von Göteborg installierte, „Big Glenn" genannte 4.1-113 Offshore Windenergieanlage ihren ersten Testlauf erfolgreich absolviert hat.


business unit
tags
Press Release

GE's 2.5 Series Wind Turbines Top 2 Gigawatts of Capacity Worldwide

April 16, 2012
Subscribe to Energy