Skip to main content
×

GE.com has been updated to serve our three go-forward companies.

Please visit these standalone sites for more information

GE Aerospace | GE Vernova | GE HealthCare 

Press Release

GE Digital’s Proficy Historian 2022 Improves Enterprise-Wide Industrial Data Management to Reduce Costs and Downtime

January 13, 2022

 

For media inquiries, please contact:

Ellie Holman
Product & Technology Communications
GE Digital
[email protected]
America/New_York

business unit
tags
Press Release

GE Renewable Energy and Continuum Green Energy sign another critical wind power project in India

January 13, 2022
  • GE Renewable Energy will supply, install and commission 37 units of its 2.7-132 onshore wind turbines to Continuum.
  • The turbines will power Continuum’s 99.9 MW Rajkot wind power project in Gujrat, India.
  • This order is GE Renewable Energy’s latest in India, which recorded 1.2 GW+ orders in 2021.
  • The Rajkot wind farm will power various industries and commercial establishments in Gujrat, India.

New Delhi, India – Jan 13, 2022 – GE Renewable Energy announced today an order from Continuum Trinethra Renewables Pvt Ltd (a subsidi

For media inquiries, please contact:

Antoine Balas
Communications, Onshore Wind
GE Vernova
+33 6 89 69 41 10
[email protected]
Anshul Madaan
Media Relations, Electrification
GE Vernova
+91 83778 80468
[email protected]

business unit
Press Release

GE Renewable Energy to refurbish generators at the historic Long Lake Hydroelectric Power Plant

January 12, 2022
  • GE Renewable Energy to rehabilitate four generators at Long Lake Powerhouse, a site listed on the U.S. National Register of Historic Places
  • The first unit is scheduled for commissioning at the end of 2024
  • Once refurbished, the lifetime of the units will be increased by another 50 years.

    For media inquiries, please contact:

    Tim Brown
    GE Vernova
    +1 302 509 9352
    [email protected]
    Waldemar Oldenburger
    Communications, Hydro Solutions
    GE Renewable Energy
    +49 172 631 22 34
    [email protected]

    business unit
Press Release

GE’s digital power transformers selected for multiple projects across the globe

January 06, 2022
  • GE’s low-maintenance power transformers address the ever-evolving challenges facing grid operators today
  • Recent orders reflect need to modernize the grid in order to address the energy transition
  • GE’s grid portfolio supports a wide range of voltage levels with applications in generation, transmission, distribution, and industrial segments

Paris, FRANCE — January 6, 2022 — GE Renewable Energy’s Grid Solutions business [NYSE:GE] today announced a series of recent wins for its low-maintenance, high-performing

For media inquiries, please contact:

Allison J. Cohen
External Communications, Grid Solutions
GE Vernova
+972 54 7299742
[email protected]

business unit
Press Release

GE Foundation Announces Disaster Relief Grant to Kentucky

December 23, 2021
US$100,000 in Grants to Fund CARE

For media inquiries, please contact:

Jeff Caywood
Director, Sustainability & Headquarters Communications
GE
+1 857 337 4101
+1 617 443 2993
[email protected]
Rachel Kent
CARE Senior Press Officer
CARE
[email protected]

business unit
Press Release

GE Digital Will Acquire Opus One Solutions to Advance the Energy Transition

December 21, 2021

 

  • Combined technology portfolio to enable broad, rapid adoption of renewables and Distributed Energy Resources (DERs) at all points on the grid
  • Creates interoperable portfolio that will help utilities forecast, manage, optimize, and trade renewables coming onto the electric grid
  • Merges a century of continuous GE innovation with a talented team of Opus One engineers and leaders dedicated to grid innovation

 

For media inquiries, please contact:

Ellie Holman
Product & Technology Communications
GE Digital
[email protected]
America/New_York

business unit
tags
Press Release

GE Healthcare completes acquisition of BK Medical

December 21, 2021

BOSTON – December 21, 2021 – GE (NYSE:GE) today announced that it has completed its previously announced acquisition of BK Medical, a leader in advanced surgical visualization, from Altaris Capital Partners, LLC.  The comp


business unit
tags
Press Release

GE Renewable Energy’s Cypress onshore wind turbine selected for repowering project in the Netherlands

December 20, 2021
  • Windplan Groen is the largest onshore wind farm in the Netherlands
  • GE to provide 26 Cypress 6.0-164 wind turbines, GE’s most powerful onshore turbine
  • Agreement includes a 25-year full-service contract.

Paris, France, December 20, 2021 – GE Renewable Energy announced today that it has been selected by Windkoepel Groen to repower part of the Windplan Groen project in Flevoland province in the Netherlands.

For media inquiries, please contact:

Antoine Balas
Communications, Onshore Wind
GE Vernova
+33 6 89 69 41 10
[email protected]
Elzo Springer
Communications Department
Windkoepel Groen
+31 6 3197 4527
[email protected]

business unit
Press Release

GE Hitachi Nuclear Energy, BWXT Canada and Synthos Green Energy Announce Intention to Support Deployment of Small Modular Reactors in Poland

December 15, 2021

Supply chain participation in deployment of small modular reactors in Poland could generate more than $1 billion in GDP for Canada, accelerate decarbonization of Polish economy and increase its competitiveness

CAMBRIDGE, ONTARIO—December 15, 2021—GE Hitachi Nuclear Energy (GEH), BWXT Canada Ltd. (BWXT Canada) and Synthos Green Energy (SGE) today announced their intention to cooperate in deploying BWRX-300 small modular reactors (SMR) in Poland.

For media inquiries, please contact:

Jon Allen
GE Vernova
+1 910 819 2581
[email protected]
Natalie Cutler
BWXT Canada Ltd.
+1 519 620 5288
[email protected]
Mariusz Ilnicki
Synthos Green Energy
+48 668 48 36 73
[email protected]

business unit
Press Release

GE successfully concludes phase 1 testing on second XA100 adaptive cycle engine

December 15, 2021

EVENDALE, Ohio – GE has concluded phase 1 testing on its second XA100 adaptive cycle engine as part of the U.S. Air Force’s Adaptive Engine Transition Program (AETP). Phase 1 testing took place at GE’s Evendale, Ohio, altitude test facility and  enabled GE to continue gathering high-quality performance data validating the engine’s transformational propulsion capability. Phase 2 tests will begin at the U.S. Air Force’s advanced testing facilities at Arnold Engineering  Development Complex (AEDC) in the first quarter of 2022.

For media inquiries, please contact:

William "Cole" Massie
Media Relations
(513) 288-4489
[email protected]

business unit
tags
Subscribe to English