What's New

V5.1.2.0.0

This section provides highlights of product changes.

Software Support

  • Rules Editor now supports Microsoft Visual Studio 2022.

Visual Changes

  • To enhance usability, the following modules have been moved from INTEGRITY to a new section named SAFETY in the module navigation menu:
    • Hazards Analysis
    • Layers of Protection Analysis
    • Management of Change
    • Mobile Proof Testing
    • SIS Management
  • To enhance usability, for an RBI analysis, the Calculate icon color now changes to orange if recalculation is required in the following scenarios:
    • Update any input fields in an RBI Analysis except Asset ID, Component, Component Description, Component Comments, Analysis ID, Analysis Type, Scenario ID, Scenario Reference date, and Functional Location.
    • Update any input fields in the related RBI Consequence except Consequence, Evaluation ID, and Comments.
    • Update any input fields in an RBI Degradation Mechanism except Degradation Mechanism, Degradation Mechanism Description, and Deg Mech Comments.
    • Update any input fields in an RBI Degradation Mechanism Evaluation except Damage Mechanism, Damage Comments, and Probability Category Description.
    • Add or delete Degradation Mechanisms from the RBI Analysis.
    This behavior is applicable to all RBI Analyses except RBI Pipeline Analysis.

Features and Enhancements

  • APM Connect: To enhance APM product solution, GE Vernova periodically updates the technology used within the supported software. As part of the APM Connect technology replacement, Talend has been replaced with Boomi as the integration tool. This change is aimed at enhancing the integration capabilities of APM Connect offering. The APM Connect versions impacted by this update are APM Connect Base version 3 and all APM Connect versions integrating with APM hosted on GE Vernova Cloud.
  • Rounds Pro: You can now migrate data from Legacy Rounds to Rounds Pro. To facilitate this enhancement, a Migration Tool has been added to the Rounds Designer Admin user interface that enables you to seamlessly migrate existing Legacy Rounds data to Rounds Pro.
  • Asset Strategy Implementation: To improve efficiency and to support creating and updating records in bulk, the Asset Strategy Implementation (ASI) Data Loader has been introduced. The Data Loader uses the baseline ASI data model to create records and link them to one another. Using the Data Loader, you can perform the following tasks:
    • Create and update Implementation Packages and Maintenance Packages containing all baseline Work Management Items (WMIs) in bulk.
    • Import custom WMIs that you have configured using the ASI Admin options.
    In addition, you can now export Implementation Packages, Maintenance Plans, and MIs in bulk using the new Export ASI Package feature. You can also export any custom WMI families. You can then use the exported package as a template to the Asset Strategy Implementation (ASI) Data Loader.
    To facilitate these new features, the following fields have been added in the ASI Admin options:
    • Lookup Fields For Data loader and Export: Used to identify the records that you want to import using the Data Loader or export.
    • Exclude Fields From Export: Used to provide the list of fields that you want to exclude while exporting a package.
    The Data Loader, combined with the Export ASI Package feature, greatly enhances the efficiency in creating, updating, and exporting ASI data in bulk.

End-of-Life Features

  • Product support for following APM versions ended on December 31, 2023. Refer to GE Digital's product support policy (KBA 000043438) for more information.

    • 4.4
    • 4.3.1
    • 4.3.0.7
    • 4.3.0.6.9
    • 4.3
    • 4.2
  • APM Connect Base 1.X and all versions of APM with APM Connect Base 2.X, except APM version 4.5, are End-of-Life (EOL) on or before December 31, 2023. For more details, refer to the GE Digital On-Premise Product Lifecycle Policy for APM and Platform Product Suites available in the customer portal. This change does not affect other areas of the APM product solution. The deadline to complete the technology replacement is December 13, 2024.