- GE’s Wind Collector Optimization Service Enables System Designs to be Done Twice as Fast as Traditional Design Methods
- Optimized Collector Cable Design Results in Cost Savings of More than 20 Percent
- Service Enables Lower Total Cost of Ownership for Customers through Improved Efficiency and Reduced System Costs
ATLANTA-April 28, 2015-When planning a wind plant, collector cable systems play a critical role in how efficiently power can be delivered from the point of generation to the grid.