Skip to main content
×

GE.com has been updated to serve our three go-forward companies.

Please visit these standalone sites for more information

GE Aerospace | GE Vernova | GE HealthCare 

Press Release

GE Unveils Brand Names for Three Planned Future Public Companies

July 18, 2022

All Three Companies will Continue to Benefit from GE Heritage 


business unit

GE Renewable Energy: GE commissions 180 MW Bajoli hydro project in Himachal Pradesh

Submitted by 503251679 on

GE Renewable Energy: GE commissions 180 MW Bajoli hydro project in Himachal Pradesh

GE Renewable Energy’s Hydropower business, part of GE Power India Limited (GEPIL) has commissioned the 180 MW Bajoli Holi Project. Three units of 60 MW each have been generating electricity since the project was connected to the grid in March 2022. The 180 MW run-of-the-river power facility has a head race tunnel of more than 16 km and has been constructed on the river Ravi in the Chamba district of Himachal Pradesh in northern India.

Press Release

GE commissions 180 MW Bajoli hydro project in Himachal Pradesh

July 06, 2022
  • The project is already connected to the grid and each of the three units with 60 MW each generates electricity
  • Facility supplies hydropower to Delhi’s Indira Gandhi International Airport that recently became the first in India to run entirely on hydro and solar power
  • Another example of the GE’s commitment to driving decarbonization for India’s energy transition journey through continuous innovation, technology, and investments

New Delhi, 6 July 2022: GE Renewable Energy’s Hydropower business, part of GE Power India Limited (GEPIL) h

For media inquiries, please contact:

Jasmine D’ Cruz
Communications Specialist
GE Renewable Energy
[email protected]
Debanjali Chakraborty
Communications Leader
GE Power India Limited (GEPIL)
[email protected]
Radhika Dutt
Senior Manager
Weber Shandwick
+91 95604 99603
[email protected]

business unit
tags
Press Release

GE Working on Behind-the-Meter Projects to Support PV Solar Integration into the Grid

June 27, 2022
Press Release

GE, Inogen and Sertavul to build first Hybrid Wind + Solar project in Turkey

June 23, 2022
  • Plant combines a 32 MW wind farm with a 30 MW solar plant
  • Project leverages compatibility of solar and wind power
  • First installation of GE’s 4.7 MW solar solution worldwide

Istanbul, June 23, 2022 - GE and its regional solution partner Inogen have been selected by Sertavul to build one of the first Hybrid Wind + Solar projects in Turkey. The plant is composed of a 32 MW wind farm commissioned in 2020 that will be integrated with a 30 MW solar plant.

For media inquiries, please contact:

Agathe Lefévre de la Houplière
Communications, Hydro Power
GE Vernova
+33 7 71 44 89 35
[email protected]

business unit
Press Release

GE acquires 49% stake in Continuum onshore wind farm in support of the energy transition in India

June 14, 2022
  • GE Energy Financial Services invests via bespoke structured preferred equity in Continuum’s 148.5 MW Morjar wind power project in Gujarat, India.
  • The project will be equipped with GE Renewable Energy’s 2.7-132 onshore wind turbines with COD expected in June 2022.

    For media inquiries, please contact:

    Arti Mohan
    Media Relations, Electrification Software
    GE Vernova
    +44 7468 351586
    [email protected]
    Antoine Balas
    Communications, Onshore Wind
    GE Vernova
    +33 6 89 69 41 10
    [email protected]
    Gayatri Rath
    Communications, South Asia
    GE
    +91 98736 91843
    [email protected]
    Abhineet Gupta
    Continuum Green Energy
    +91 22 2570 1561
    [email protected]

    business unit
Press Release

GE to triple its solar and battery energy storage Power Electronics capacity in 2022

June 07, 2022

Paris, France; June 7th, 2022 - GE is tripling its solar and battery energy storage Power Electronics Systems manufacturing capacity by the end of 2022 to 9 GW per annum, linked to strong growth in backlog over the past few months and a robust demand outlook.

For media inquiries, please contact:

Tim Brown
GE Vernova
+1 302 509 9352
[email protected]
Agathe Lefévre de la Houplière
Communications, Hydro Power
GE Vernova
+33 7 71 44 89 35
[email protected]

business unit
Press Release

GE introduces new Sierra platform, next-generation 3 MW onshore wind turbine designed specifically for the North America region

May 17, 2022
  • 3.0-3.4 MW onshore turbine featuring 140m rotor and variety of hub heights
  • Next generation of innovation with ease of install and reliability
  • High-tech two-piece blades enable improved logistics and serviceability

SCHENECTADY, NY, May 17, 2022 - GE Renewable Energy today announced Sierra, its newest onshore wind turbine platform designed specifically for the North America region.

For media inquiries, please contact:

Tim Brown
GE Vernova
+1 302 509 9352
[email protected]

business unit
tags
Press Release

GE Using AI/ML to Reduce Wind Turbine Logistics and Installation Costs

April 04, 2022
Subscribe to GE Renewable Energy