Lahore, Pakistan; May 10, 2018: National Power Parks Management Company Limited (NPPMCL), GE and SEPCOIII Electric Power Construction Co., Ltd. today announced that the Haveli Bahadur Shah (HBS) power plant has completed all commissioning activities and has now started combined cycle commercial operations to add up to 1,230 megawatts (MW) of reliable power to the national grid. The project is among the largest gas-fired combined cycle plants in the country, capable of supplying the equivalent power needed to meet the electricity needs of up to 2.5 million Pakistani homes and one of the most efficient combined cycle power plants in the world today.
“The start of combined cycle commercial operations at Haveli Bahadur Shah (HBS) Power Plant marks a major milestone in the power sector of Pakistan, supporting the government’s goal to enhance access to reliable, affordable power,” said Rashid Mahmood, CEO of NPPMCL. “The project has been developed to the highest standards of quality and excellence, and will serve as a benchmark for future electricity projects in terms of the technology being deployed.”
The HBS project was initiated by NPPMCL, which is solely owned by the Government of Pakistan through the Ministry of Water & Power, and was entirely funded through the Public-Sector Development Programme (PSDP). SEPCOIII Electric Power Construction Co., Ltd (SEPCOIII) is the engineering, procurement and construction (EPC) contractor for the project, responsible for setting up the power plant and all commissioning activities. GE has supplied two of its advanced HA heavy-duty gas turbines, one steam turbine and two heat recovery steam generators (HRSGs) for the plant, as well as technical advisory services.
Wang Zengxu, SEPCOIII’s Project Director at HBS added, “The Haveli Bahadur Shah Power Plant demonstrates the power of global collaboration with the application of best-in-class technology. We have drawn on a leading combination of exceptional Chinese engineering skills and knowhow, together with GE’s record-setting technology for the facility, to build the most efficient combined cycle power plant in the country.”
The Haveli Bahadur Shah Power Plant is about the size of 65 football fields and staff from over 35 countries worked together to complete the project. The project’s execution has been among the fastest globally and 3 to 4 months shorter than typical for projects of comparable scale and complexity. Performance tests to date indicate that HBS has set world record levels of efficiency.
Mohamad Ali, President and CEO of GE’s Gas Power Systems - Projects business in the Middle East, Pakistan and India, added, “The Haveli Bahadur Shah Power Plant uses industry-leading power generation equipment, including GE’s HA technology - the world’s most efficient heavy-duty gas turbine. This innovative technology is helping to unlock unprecedented levels of efficiency in Pakistan’s power sector, ultimately lowering the cost of electricity production. GE has long supported the development of Pakistan’s energy sector and through our collaboration on this transformational project, we are underscoring our commitment to provide solutions that are truly game-changing.”
GE’s HA technology has undergone full-speed, full-load validation tests at GE’s Greenville, South Carolina facility in the United States at extreme conditions well beyond those encountered while in service. It is the fastest growing fleet of heavy-duty gas turbines today, with more than 75 units ordered to date by over 25 customers across more than 15 countries, including the United States, Mexico, Brazil, Pakistan, Japan, Bahrain, China, France and others. The technology has now delivered two world records - one for powering the world’s most efficient combined-cycle power plant, based on achieving 63.08 percent gross efficiency at Chubu Electric Nishi-Nagoya Power Plant Block-1 in Japan and another for helping EDF’s Bouchain Power Plant achieve 62.22 percent net combined cycle efficiency in France. With these achievements, GE’s HA turbine has been recognized for powering the world’s most efficient power plants in both the 60 hertz (Hz) and 50 Hz energy segments. Furthermore, the HA can ramp up or down quickly, while still meeting emissions requirements to help maintain grid stability. It thus offers an excellent flexible complement to intermittent renewable sources as Pakistan increases the proportion of alternative energy.
GE’s H-class technology is also being used at Pakistan’s upcoming Bhikki and Balloki Power Plants. Together, HBS, Bhikki and Balloki are expected to add up to 3,600 MW to Pakistan’s grid, going a long way towards helping the government realize its goal under Vision 2025 to enhance access to electricity to over 90 percent of the population.
GE has supported the development of energy, transportation and healthcare infrastructure in Pakistan for more than 50 years. Today, GE-built technologies can generate the equivalent power needed to supply up to 25 percent of the country’s electricity.
-ends-
Notes to Editor
About SEPCOIII:
SEPCOIII is a wholly-owned subsidiary of Power Construction Corporation of China and a professional engineering enterprise in terms of EPCO, EPC, BOT, BOO, PMC and so on in electric power sector. Since being founded in 1985, SEPCOIII has aggregated installed capacity of 86,000 MW and ranked 58th of Top 250 International Contractor of ENGR (Engineering News Record) in 2014. At present, its customer base has spread across 18 countries through 46 turn-key projects including India, Nigeria, Pakistan, Bangladesh, Kuwait, Myanmar, Jordan, Saudi Arabia, Oman, Iraq, Egypt, Morocco, Turkey, Indonesia and Singapore etc. SEPCOIII has been devoting himself to building the project with best quality and the economic and technical indicators within shortest period. Therefore, it has been awarded China’s Luban Prize for 8 times and National Quality Engineering Gold Medal for 3 times by now.
About NPPMCL:
National Power Parks Management Company Limited (NPPMCL) is a wholly owned company of the Government of Pakistan engaged in setting up the Balloki and Haveli Bahadur Shah regasified liquefied natural gas (RLNG) power plants to meet the energy demand in Pakistan.
About GE:
GE (NYSE: GE) is the world’s Digital Industrial Company, transforming industry with software-defined machines and solutions that are connected, responsive and predictive. GE is organized around a global exchange of knowledge, the "GE Store," through which each business shares and accesses the same technology, markets, structure and intellect. Each invention further fuels innovation and application across our industrial sectors. With people, services, technology and scale, GE delivers better outcomes for customers by speaking the language of industry. www.ge.com
About GE Power:
GE Power is a world energy leader that provides technology, solutions and services across the entire energy value chain from the point of generation to consumption. We are transforming the electricity industry by uniting all the resources and scale of the world’s first Digital Industrial company. Our customers operate in more than 150 countries, and together we power more than a third of the world to illuminate cities, build economies and connect the world.
For more information, visit the company's website at www.gepower.com. Follow GE Power on Twitter @GE_Power and on LinkedIn at GE Power.
For more information on GE, please contact:
Shafia Naseer
Communications Manager, GE Pakistan & Iran