Version 8.1

This topic provides a list of product changes for ERP Integration for this release.

Table 1. Enhancements and New FeaturesThe following enhancements and new features have been added.
DescriptionTracking ID
In addition to Work Orders, Process Orders, and Materials, you can now import Material Lot and Outside Processing (OSP) to Plant Applications. To facilitate this enhancement:
  • The required properties of a Material Lot (such as OrgCode) must be created in Property Definition.
  • Values of these properties must be defined in Plant Applications Administrator.
  • The Material Lot Import Document (MLID) must contain all the required properties of the Material Lot.

F48473

An ERP-Export service is introduced. The ERP Export service sends the events from the Plant Applications Web Client to the ERP system (or middleware / interfacing system). The ERP Export service sends notifications from the Plant Applications Web Client to the ERP system when the following events occur:
  • Operation Complete
  • Clock on a serial/lot
  • Clock off a serial/lot
  • Material Scrap
  • Route Release

F46586

F37771

F45626

ERP Integration now supports serialized and non-serialized import of Work Orders and Materials. F45347
Notifications are now sent to ERP when the following events occur in Plant Applications Web Client:
  • A route is released
  • An operation is clocked on or clocked off
  • An operation is complete
F45988
When raw materials are sent to an ERP system, the Plant Applications Web Client can access and process messages that are generated when a raw material is received and represent the associated material lots.F46587