Advanced and innovative steam turbine technology

The Arabelle nuclear steam turbine suits power outputs ranging from 700 MW to 1,900 MW. Arabelle has been the largest turbine in operation worldwide for the past 20 years and has two units in China which each produce up to 1,750 MW.

content-1-arabelle.jpg

Adapted for all rector types

Fully adaptable steam path

  • From 700 MW to 1,900 MW, 50 Hz or 60 Hz
  • For any backpressure conditions
content-2-arabelle.jpg

More power with the 1900 MW steam turbine

Our Arabelle nuclear steam turbine features:

  • A compact, powerful, efficient and reliable turbine
  • 60 percent of the power comes from highly efficient single flow expansion
  • A unique combined HP/IP module
  • Standard interface/footprint for 50 Hz  and 60 Hz
content-3-arabelle.jpg

Arabelle LP size configured for all site conditions

  • A range of last-stage blade sizes for each frequency (50 Hz and 60 Hz)
  • The largest last stage blade in operation (LSB69)
  • The largest last stage blade in construction (LSB75)
  • Proven blade design with demonstrated reliability
  • Two, three or four LP modules for excellent back-pressure fit
content-4-arabelle.jpg

Designed for ease of maintenance

  • Cross-under pipes below the foundation for reduced maintenance duration and costs
  • Large lay-down areas alongside the LP modules
  • Easier adjustment of LPs with independent structure
  • Compact arrangement with fewer bladed rows
Additional benefits

Improved architecture for more reliability

Turbine ARABELLE 1750 mw

Low pressure exhaust with independent structure

Arabelle nuclear steam turbine improves on the previous generation low pressure (LP) exhaust design with fully independent LP cylinders. By connecting the LP inner casing to an end wall rather than the LP outer casing and ultimately the turbine table, the outer casing no longer needs to act as support.  This simple but powerful design innovation greatly reduces turbine load on the foundation, caused by vacuum variations or condenser forces while improving centering of moving and stationary parts.

content-6-arabelle.jpg

Efficient, reliable blading

The entire family of Arabelle nuclear turbine blades features three-dimensional profiles engineered with high aerodynamic performance in mind. All rotating blades except the last stage blade (LSB) include integral shrouds to minimize loss. The resulting continuous blade structure helps ensure reliable and consistently good frequency control. To provide effective vibration control during service, an integral streamlined snubber interconnects the LSBs.

hero-arabelle.png
Specifications

Arabelle nuclear platform

Our power conversion solutions for large and very large reactors are based on our Arabelle steam turbine technology platform.

  • 50Hz
  • 60Hz
50 Hz selected
  ARABELLE 1700 ARABELLE 1000
Typical Reactor Output 3500 – 4900 MWth 2500 – 3500 MWth
Shaft Line Rotational Speed Half speed Half speed
HP/HIP Turbine Type 25NHIP17 25NHIP10
Number of LP Turbines 3 or 4 2 or 3
Last Stage Blade Length in Inches (“) 57, 69, 75 57, 69, 75

Specifications for EPR and CPR1000 reactors (50hz only)

  ARABELLE 1700 ARABELLE 1000
Reactor Type EPRCPR1000
Configuration Combined HIPCombined HIP
LP Turbine Type LP75, LP69, LP57LP57
Speed (rpm) 15001500
Output 1755 MW1080 MW
Heaviest Lift – LP Rotor (tons) 280190
Power Train Width (m) 2017
Hook Height (m) 1514.5
Power Train Length including Generator (m) 7056
Customer stories

Largest nuclear steam turbines ever made to boost UK grid

GE Steam Power will supply the two turbine islands for Hinkley Point C (HPC), which include the Arabelle steam turbine, generator, and other critical equipment. Already the largest steam turbine in operation in Taishan, China, the Arabelle produces 2% more power output than a traditional configuration and has a 99.96% reliability rate. HPC’s Arabelle turbines will be the largest ever built—longer than a Boeing 747 with its associated generator —and capable of producing 1,770 MW each.

3.2GW

Output from Hinkley Point C

6 million

homes powered

9 million

tons of CO2 avoided each year

content-hpc-arabelle.jpg

Powering Egypt Forward

GE Steam Power will deliver 4x1200 MW Arabelle steam turbines and generators for El Dabaa, Egypt’s first nuclear power plant. The power plant will deliver 4.8 GW of dependable, reliable, CO2 free energy—enough to power more than 4 million Egyptian homes.

4.8 GW

output

4 million

homes powered