Xtend™ Hot Section Upgrade - SAC
The Xtend™ Hot Section for LM/TM2500 Base SAC engines increase the hot section life to 50,000 hours, reduces lifecycle costs, and increases site availability. By utilizing advanced hot section technology from the LM2500+G4, the Xtend™ SAC has improved materials, coatings, and enhanced secondary cooling. Additionally, the Xtend™ SAC combustor and fuel nozzle kit is available as an option for gas/dry applications.
- Availability
- Reliability
What Can Upgrading Do for You?
- Doubles anticipated LM/TM2500 Base SAC hot section life.
- Reduces lifecycle cost 15% by eliminating on hot section repair/exchange in each MOH cycle.
- Greater availability from avoided hot section replacement downtime – 144 hours of operation over two MOH cycles.
- OEM-approved life extension.
How we get you there
- The LM2500 Xtend™ High Pressure Turbine has over 2 million operating hours during more than 10 years of use.
- Advanced hot section technology from the LM2500+G4 provides:
- Improved materials
- Coatings
- Enhanced secondary cooling
- Introduction of a new deswirler.
- Xtend™ SAC combustor and fuel nozzle kit available as an option for gas-only applications.
- Xtend™ now available for LM2500 DLE 1.0 Applications.
Applicable Turbine Models
- LM/TM2500 Base SAC