Challenge
Platte River Power Authority is a not-for-profit wholesale electricity generation and transmission provider in Colorado. Platte River’s 668 MW Rawhide Energy Station consists of a primary coal fired unit with four GE 7EA gas turbines as peaking and backup units. Additional power sources include coal, hydro, and wind.
Platte River required a backup of its primary unit as well as a backup for any other operating sources. Additionally, they wanted a hedge against short-term market pricing fluctuations, while maintaining strict emissions controls.
Solution
To achieve Platte River’s goals, GE installed OpFlex Fast Start software solution on two of the four GE 7EA, 65 MW gas units. This software-only modification allows for rapid starting and loading of the gas turbines, with a guarantee of 90% base load within 10 minutes, while reducing fuel burn and start up emissions.
Results
Platte River is now able to quickly start and load two 7EA gas turbines for approximately 117 MW in 10 minutes. These gas turbines can now realistically act as a backup for Rawhide’s primary unit and for system emergencies.
See More Outcomes
Discover how we helped Avista improve output.
Learn MoreWe will retrofit four Toshiba steam turbines at POSCO Pohang Works steel manufacturing facility.
Learn MoreDiscover how we're working with ENKA to power Turkey.
Learn More