Skip to main content
×

GE.com has been updated to serve our three go-forward companies.

Please visit these standalone sites for more information

GE Aerospace | GE Vernova | GE HealthCare 

Press Release

GE Renewable Energy's LM Wind Power produces 44,444th blade in India

July 07, 2021

Bangalore, India, 7 July 2021 - GE Renewable Energy announced today it has produced its 44,444th wind turbine blade at LM Wind Power’s wind turbine blade manufacturing sites in India. These blades have been manufactured in the two factories located near Bangalore, Karnataka and in Vadodara, Gujarat.

For media inquiries, please contact:

Gayatri Rath
Communications, South Asia
GE
+91 98736 91843
[email protected]

business unit
Press Release

GE Renewable Energy and TNO to test new research on blade tip improvements aimed at reducing levelized cost of energy (LCOE) of offshore wind power

June 23, 2021
  • Project TIADE (Turbine Improvements for Additional Energy) to develop and validate innovative wind turbine blade improvements, blade add-ons to boost the performance of offshore wind turbines.
  • Innovations developed in the project will be tested on a full-scale research wind turbine using inventive field measurement techniques.
  • Prototype turbine operational, measurements to begin soon

Paris, June 23, 2021 – A consortium of GE Renewable Energy, LM Wind Power and TNO, are collaborating on the TIADE project to develop technologies and d

For media inquiries, please contact:

Chandra Duraiswamy
Director, Communications
LM Wind Power
+91 9884309502
[email protected]
Kees Nanninga
Press officer
TNO
+31 6 15498651
[email protected]

business unit
Press Release

GE Yenilenebilir Enerji'nin Bergama Rüzgâr Türbin Kanadı Üretim Tesisi  1111. Türbin Kanadını Üretti

June 22, 2021

 

GE Yenilenebilir Enerji'nin Bergama Rüzgâr Türbin Kanadı Üretim Tesisi  1111. Türbin Kanadını Üretti


 


business unit
tags
Press Release

GE Renewable Energy’s Bergama wind turbine blade manufacturing site produces 1111th blade

June 22, 2021

Istanbul, Turkey, 22 June 2021: GE Renewable Energy today announces the production of the 1111th wind turbine blade at its LM Wind Power’s wind turbine blade manufacturing site in Turkey, four years after the start of the production at the new plant in Bergama, İzmir. Devoted to respond to the growing demand for wind energy worldwide, including in Turkey, Europe and Asia, these 1111 blades are meant to capture the wind for a total capacity of about 1.58 GW.

For media inquiries, please contact:

Chandra Duraiswamy
Director, Communications
LM Wind Power
+91 9884309502
[email protected]
Agathe Lefévre de la Houplière
Communications, Hydro Power
GE Vernova
+33 7 71 44 89 35
[email protected]

business unit
header-image
Innovation

The Way Forward: How GE Engineers Are Helping Build A Path To A Renewable Future

Will Palmer
April 20, 2021

In the five decades since the first Earth Day, the world has made much progress in understanding the perils posed by climate change and finding the solutions we need. But we are far from done. The switch to electric cars alone will force us to reimagine not only how we make electricity, but also how we distribute it.

Renewables are clearly a big part of the future of energy, but so are natural gas, energy storage, hydropower and the digital grid. Other industries, like aviation, must also decarbonize to help prevent the planet from warming.

header-image

Rüzgâra Yön Veren Kadınlar

March 22, 2021

Kadınlar, hayatımızın her alanına yön veriyor. Kimisi bir yönetici olarak iş yerine, kimisi bir anne olarak ailesine, kimleri ise rüzgara yön veriyor. LM Wind Power, bu yılki Kadınlar Günü'nde diğer kadınlara ilham olması için bir etkinlik düzenledi ve katılımcı olarak kendi bünyesinde çalışan kadınları bu söyleşiye davet etti. Söyleşi, Bergama Fabrika Müdürü Emre Kahya ve Manufacturing Executive Torben Molby'nin açılış konuşması ile başlarken; moderatörlüğü İSG Müdürü Burcu Tatar üstlendi.

Press Release

GE Renewable Energy to hire 300 employees in 2021 for its wind turbine blade factory in Cherbourg, France

March 16, 2021
  • GE Renewable Energy plans to recruit 300 employees in 2021 at its LM Wind Power wind turbine blade factory in Cherbourg, France
  • Opened almost three years ago in April 2018, the factory today counts more than 450 employees
  • Every new hire will go through an intensive training program at the factory's ‘Center of Excellence' to learn wind turbine blade manufacturing processes
  • Site has produced the first offshore wind turbine blade longer than 100 meters, 107-meters long
  • Second 107-meter blade manufacturing mold is being installed at the plant today

    For media inquiries, please contact:

    Agathe Lefévre de la Houplière
    Communications, Hydro Power
    GE Vernova
    +33 7 71 44 89 35
    [email protected]

    business unit
Press Release

GE Renewable Energy recrute 300 employés en 2021 pour son usine de pales d'éoliennes LM Wind Power à Cherbourg, en France

March 16, 2021
  • GE Renewable Energy prévoit de recruter 300 employés dans son usine de fabrication de pales d'éoliennes LM Wind Power à Cherbourg, en France, pour l’année 2021.
  • Ouverte il y a presque trois ans, en avril 2018, l’usine compte aujourd’hui plus de 450 employés.
  • Chaque nouvel employé suivra un programme de formation intensive au « Centre d'excellence » de l'usine pour apprendre les processus de fabrication des pales d'éoliennes.
  • L’usine a produit la première pale d’éolienne en mer à dépasser 100 mètres, d’une longueur de 107 mètres.
  • Un deuxième mou

    For media inquiries, please contact:

    Agathe Lefévre de la Houplière
    Communications, Hydro Power
    GE Vernova
    +33 7 71 44 89 35
    [email protected]

    business unit
header-image
Renewable energy

North Sea Power: New GE Plant Will Make 107-Meter-Long Wind Blades In The U.K.

Daniel Kruger
March 11, 2021

 

 

A new GE plant in northeast England will make the world’s longest wind turbine blades to date. Measuring 107 meters from tip to root, the blades are a key component of GE’s Haliade-X, the most powerful offshore wind turbine in operation.

Press Release

GE Renewable Energy plans to open new offshore wind blade manufacturing plant in Teesside, United Kingdom

March 10, 2021
  • LM Wind Power plans to open and operate a brand-new manufacturing plant for the production of offshore wind turbine blades, due to open and start production in 2023
  • The manufacturing facility could create 750 direct renewable energy jobs and close to 1,500 indirect jobs in the area
  • The facility would address the needs of the strong offshore wind market in the UK
  • The Dogger Bank Offshore Wind Farm, which features GE’s Haliade-X offshore wind platform, would directly benefit from the blades produced

Paris, March 10, 2021 – G

For media inquiries, please contact:

Sebastien Duchamp
Communications Director
GE Renewable Energy
+33 6 73 19 59 64
[email protected]

business unit
Subscribe to LM Wind Power