The day before, two GE LM6000 gas turbines in operation at the PLTG Senipah (PLTGS) power plant in Teluk Pemegas village, malfunctioned cutting power to three cities – Balikpapan, Tenggarong, and Samarinda - connected to the plant’s Mahakam network.
Engineer Mark Leary has been helping GE Aviation build jet engines for three decades. The work is in his blood — literally. More that 60 years ago, Mark’s mother, Patricia, helped the company design the supersonic engine that allowed Lockheed to build the F-104 Starfighter jet, known as “the missile with a man in it” and capable of sustained flight at twice the speed of sound, or Mach 2.
With great progress, comes even greater demand. With over 74% of Myanmar’s population lacking access to electricity, the need to have an efficient power generation system could not be more important. As a country, it is imperative for Myanmar to build the right infrastructure and partner with the right companies to provide the most efficient technology, and ultimately, cost savings to the people of the Myanmar.