FAIRFIELD, Conn. - December 23, 2014 -- GE announced today the appointment of three new Company officers. Effective January 1, 2015, GE will have 195 officers globally who lead large revenue-generating businesses or are in critical technology or functional roles, helping to drive growth.
2014年12月16日,上海--今天,2014GE基金会科技创新大赛在上海落下帷幕,来自上海交通大学的瞿振元脱颖而出摘得本次大赛的桂冠,其他奖项也花落18名来自全国各地的硕士和博士研究生。上海市科学技术协会副主席陆檩、上海市科学技术委员会对外科学技术交流中心主任朱军浩、GE全球副总裁兼中国研发中心总裁陈向力博士出席了今天的颁奖典礼。自2002年至今,已有大约370名学生获得此项荣誉,体现了GE致力于培养和激励新一代中国创新人才的决心。
科技创新奖由GE基金会出资,GE中国研发中心与国际教育协会合作举办,上海市科委对外科学技术交流中心作为活动支持单位,旨在培养及发掘本地科研人才,鼓励在校学生研究实用的科技创新技术,并培养从事科学及工程类工作的兴趣。大赛面向全国在校大学生,覆盖能源、水处理、电子与电气工程、机械与制造工程、化学工程领域及材料科学等领域。相比其他学术类竞赛,GE基金会科技创新赛更注重在实用性技术方面实现创新,鼓励大学生针对经济发展、市场变化以及产品开发的需求来展现自己的创新能力及团队合作精神。
business unit
tags
- GE’s Two 7F.05 Gas Turbines and DLN 2.6+ Technology to Provide Enhanced Reliability to the PJM Interconnection Region, Including 13 States and Washington, D.C.
- Fuel Flexibility Allows for Use of Clean-Burning Natural Gas and Backup Ultra-Low-Sulfur Diesel Fuel Oil
SCHENECTADY, N.Y.-December 10, 2014-GE (NYSE: GE) announced today that it will provide two of its highly efficient and flexible 7F.05 gas turbines to Calpine Corporation (Calpine) for the York 2 Energy
business unit
tags
- New Bielsko-Biala Facility to Become One of GE’s First Global Brilliant Factories with Advanced Manufacturing to Bring Products to Market Faster
- Strategic Site Will Offer a Collaborative, High-Tech Work Environment for Product Development, Manufacturing and Customer Engagement
- World-Class Building and Labs to be Designed and Constructed in Conjunction with Panattoni Europe and CBRE
BIELSKO-BIALA, Poland - Dec.
business unit
tags
- Mace Selects Natural Gas-Fired Distributed Power Technology from GE and Clarke Energy to Provide Power and Heat to the Nova Development in London’s Victoria Area
- CHP System to Supply Nearly 3 Megawatts for Land Securities’ Nova Redevelopment Project, Enough to Power More than 5,700 Standard U.K.
business unit
tags
- Lab Expands On-Site Resources of New Product Introduction (NPI) Accelerator Lab, Enabling Build and Design for Manufacturability, Robotics and Automation to Support New Circuit Breaker Platform Launch
- GE Uses FastWorks Methodology to Deliver GuardEon* Molded Case Circuit Breaker Platform Significantly Faster than Typical Industry Development Time
- GE Will Open New Circuit Breaker Center of Excellence with Advanced Manufacturing Capabilities in Arecibo, Puerto Rico
PLAINVILLE, Conn. - Nov.