Baghdad, Iraq; 30th June, 2020: GE Gas Power successfully completed services on four 9F.03 gas turbines, two steam turbines and six generators at Iraq’s Besmaya Power Plant safely and on time, while continuing to execute wider operations and maintenance (O&M) works at the site despite the many challenges posed by the COVID-19 pandemic.
- Predix Asset Performance Management (Predix APM) Optimizes Plant Performance Using Advanced Digital Twin Analytics and Digitized Processes to Drive Plant Uptime and Operational Efficiency
- GE Digital Recommended for successful APM deployment and partner for industrial transformation initiatives
- GE Digital solutions serve Power Generation, Oil & Gas, Petrochemical industries
SAN RAMON, Calif.
For media inquiries, please contact:
Product & Technology Communications
GE Digital
[email protected]
America/New_York
business unit
tags
- GE researchers developing an artificial intelligence (AI) and machine learning (ML)- enabled inverse design framework that allows performance metrics to create more optimized designs for industrial gas turbine (IGT) aerodynamic components
- Project aims to achieve a 30-50% reduction in design cycle times, or from 1 year to a few months
- Partnered with University of Notre Dame and GE Gas Power on the project
- Emerging digital toolset will help push combined cycle
business unit
tags
BOSTON — June 22, 2020 — GE (NYSE:GE) announced today that, following a thorough and competitive review process, its Audit Committee selected Deloitte as the company’s independent auditor for the 2021 fiscal year.
KPMG will continue in its capacity through the completion of its audit services for the fiscal year ending December 31, 2020, and the filing of GE’s 2020 Annual Report on Form 10-K. The selection of Deloitte concludes the audit tender process that GE announced in December of 2018.
About GE
For media inquiries, please contact:
Mary Kate MullaneyDirector, Financial & Executive Communications
GE
+1 202 304 6514
[email protected] Steve Winoker
Vice President, Investor Relations
GE
+1 617 443 3400
[email protected]
business unit
tags
BOSTON, Mass.—June 19, 2020—The Board of Directors of GE (NYSE: GE) today declared a $0.01 per share dividend on the outstanding common stock of the Company. The dividend is payable July 27, 2020 to shareowners of record at the close of business on June 29, 2020. The ex-dividend date is June 26, 2020.
About GE
business unit
tags
- GE Healthcare continues to provide tools to support clinicians in today’s COVID-19 environment
- Thoracic Care Suite harnesses the power of AI to scan for eight chest x-ray abnormalities, including pneumonia indicative of COVID-19 – a key cause of mortality in patients who contract coronavirus [1]
- The AI suite, featuring Lunit INSIGHT CXR [2], also includes an algorithm to detect tuberculosis, which affects approximately 10 m
For media inquiries, please contact:
Margaret Steinhafel
+1 608 381 8829
[email protected]
America/Chicago
business unit
- GE Renewable Energy plans to recruit 250 employees at its LM Wind Power wind turbine blade factory in Cherbourg, France, by the first quarter of 2021.
- Every new hire will go through an intensive training program at the factory's ‘Center of Excellence' to learn wind turbine blade manufacturing processes.
- Opened two years ago in April 2018, the factory today counts more than 300 employees, and has produced the world’s largest offshore wind turbine blade ever manufactured, 107-meters long.
Cherbourg, Thursday June 18th, 2020 - GE Renew
For media inquiries, please contact:
Sebastien DuchampCommunications Director
GE Renewable Energy
+33 6 73 19 59 64
[email protected]
business unit
- End-to-End Solution Enables Electric Utilities to Meet Customer Expectations of a Reliable and Resilient Distribution Grid Via Next-Generation Control and Optimization
- Approximately 25% of the world’s meters served by ADMS are already managed by GE Digital’s solution. Leading utilities around the world like i-DE in Spain, UK Power Networks in the UK and PPL in the USA benefitting from GE Digital’s ADMS
For media inquiries, please contact:
Ellie HolmanProduct & Technology Communications
GE Digital
[email protected]
America/New_York
business unit
tags
- Historic multi-year collaboration between three leaders in their industry to increase renewable energy production and use
- Wind turbine towers have typically been limited to a height of under 100 meters, as they are traditionally built in steel or precast concrete
- Printing the base directly on-site with 3D-printed concrete technology will enable the creation of larger bases and cost-effective taller hybrid towers, reaching up to 200 meters
- Taller towers capture stronger winds, thereby generating more energy at a lower cost
- First prototype succes
For media inquiries, please contact:
Eva Mairinger
Head of Media Relations
LafargeHolcim
+41 58 858 87 11
[email protected] Asger Dath
Communications Manager
COBOD International A/S
+45 2067 9535
[email protected] Sebastien Duchamp
Communications Director
GE Renewable Energy
+33 6 73 19 59 64
[email protected]
business unit