What can upgrading to T-Fire solutions do for you?

Significantly increase output, efficiency, reliability, and availability with advanced materials and improved cooling features. The T-Fire upgrade helps your turbine withstand higher firing temperatures, increasing both component durability and inspection intervals.

Increase your turbine’s firing temperature

GE can modernize asset performance by uprating the base firing temperature of any vintage 6B gas turbine up to 2,084 °F or the latest 6B.03 AGP configuration up to 2,114 °F, and any vintage 7E.03 and 9E.03 up to 2,055 °F, with hot gas path and controls modifications.

  • If no hardware change is required (controls only), the T-Fire upgrade will take 1 – 2 days.
  • If advanced hot gas path parts are needed to perform the T-Fire increase, the upgrade will take 15 – 25 days.