GE’s AGP for 6F.03 gas turbines is a significant upgrade of hot gas path components combined with the latest 6F DLN 2.6+ combustion system. This upgrade can deliver reduced annual baseload fuel costs and longer time between HGP inspections while keeping plants flexible for a dynamic environment.
Our AGP-Lite solution also includes an option to modify existing hardware, which allows users to get the same benefits without needing to dispose of existing assets in inventory.
Increases simple cycle and combined-cycle MW output by up to 8.2% and 8.0%, respectively. Also increases exhaust energy by up to 4.5%.
Reduced baseload fuel consumption per MWh by improving full-load simple cycle and combined-cycle heat rate up to 1.8% and 1.6%, respectively.
Able to achieve up to 32k FFH and 1,350 FFS.