How much can you improve the economic performance of your plant?
*Disclaimer: Results of this calculator may vary based on the inputs and calculations and are based on combined cycle information.
Define your Combined Cycle Power Plant:
Please fill out the table below with your own values.
The prefilled values are based on averages and examples to help guide you.
Plant Details:
Click the boxes below to change default values. *required fields
Spark Spread:
*required fields
GE APM Reliability Benefit:
OPTIONALPlease provide your specific plant details.