Reliability Centered Maintenence (RCM) Analysis Workflow

This workflow provides the basic, high-level steps for using this module. The steps and links in this workflow do not necessarily reference every possible procedure. For more procedures, see the links in the Related Information section.

  1. Create the RCM Analysis record.
  2. Create the analysis team .
  3. Define the equipment and location list, which helps define the RCM system. Note that each RCM FMEA Asset record can optionally be linked to an Equipment or Functional Location record.
  4. Define the functions of the system.
  5. Define functional failures for each system function.
  6. Define failure modes for each Functional Failure.
  7. Define the failure effects for each Failure Mode.
  8. Define recommendations for each Failure Effect.

GE Digital APM provides various tools that you can use to accomplish these tasks. The tools that you use will depend on your personal preference.

Copyright © 2017 General Electric Company. All rights reserved.