skip to main content
History

History

  • Installed 1st gas turbine

  • 1st combined cycle plant of GE technology with 206B Commissioned

  • Executed the 1st Controls retrofit on gas turbine

  • GE CT and MRI installed by GE Healthcare

  • Healthymagination Launched

  • Commissioned Bangladesh NLDC - Managing around 8.5 GW of power flow for the electrical grid
  • 1st GE equity investment in a power project (2X9E, Meghnaghat)
  • Biman Bangladesh orders 4 GE90-115B engines from GE Aviation

  • Established 1st medical Cyclotron facility, Pet-CT Imaging System & 1st Digital Mammography system to enable early detection of Cancer

  • Biman Bangladesh orders 4 GE90-115B engines from GE Aviation

  • GE Healthcare provides first and only 128-slice CT and 1.5T MRI
  • 1st engagement of GE F-Class technology in a CCPP (Bibiyana-2)

  • 1st complete combined cycle power block from GE (EGCB, Siddhirganj)

  • Full-fledged hospital support system installation in JV hospital - Fortis. 1st Brivo series MRI system Installed
  • Supplied the highest capacity power transformer (420 kV, 520 MVA, 3 phase) for Bibiyana-2 Substation

  • 1st order of Effluent Treatment Plant using Membrane Bio Reactor (MBR) system
  • 1st 9E based complete combined cycle power block (Max Power, Fenchuganj)
  • 500th Jenbacher Engine sold

  • 1st Repowering Project – GE won the repowering contract for Ghorashal Gas Power Plant Unit 3 (BPDB)
  • 1st 9F.03 Advanced Gas Path Gas Turbine – GE won the equipment supply contract for Ghorashal Gas Power Plant Unit 4 (BPDB)
  • Dhaka 2 - 1x 700 MW USC  coal fired project by Orion Group – GE signed contract with Orion Power Dhaka2 Limited  for Boiler and STG  package

  • 1st 9HA Gas Turbine order – GE to develop 600 MW CCPP in Meghnaghat on a turnkey basis (Summit Corporation)
  • 1st LMS 100 Gas Turbine order – GE to supply GT for 100 MW power plant in Shahjibazar (Jiangsu Etern Company Ltd.)
  • GE won an order to supply Engineered Equipment Package for 220 MW CCPP Bhola Project (Shapoorji Pallonji Group)
  • Maitree - 2 x 660 MW Super Thermal Power Project by Bangladesh India Friendship Power Company Pvt Limited (BIFPCL) (A Joint Venture Company of BPDB & NTPC Ltd.) – GE signed contract with BHEL for Supply of Pressure parts components from DGP workshop and Windbox for 2 Units from USA

 

  • Another 9HA Gas Turbine order - GE to develop 600 MW CCPP in Meghnaghat on a turnkey basis (Unique Group)
  • Soda Boiler renovation at Karnafuli Paper Limited (subsidiary of BCCI)
  • Godda 2x800 MW USC coal fired project by Adani Group – GE signed contract with SEPCO 3, who is the EPC contractor for this project for STG package to be installed in India and power to exported to Bangladesh. Project under execution